Use this checklist to make bids comparable. It does not tell you which contractor to hire; it reveals whether each contractor has priced the same floor, preparation, system, safety obligations, and hand-off.

For local scope options, see our commercial epoxy flooring.

Before inviting bids

  • Write the room use, traffic, chemicals, cleaning method, wet conditions, texture priorities, and appearance expectations.
  • Mark cracks, joints, spalls, drains, slopes, edges, old coatings, oil, damp areas, and fixed equipment on a floor plan.
  • State access hours, available power, water, heating, ventilation control, storage, and waste restrictions.
  • Identify the owner representative who can approve hidden-condition changes.
  • Give every bidder the same photos, floor plan, service conditions, and required bid format.

Do not begin with a desired resin name alone. A product can only be evaluated against the substrate and use.

Contractor and project administration

  • Legal business name and contact information appear on the proposal.
  • The proposal identifies who supervises the work and who performs specialized testing.
  • Required licensing, insurance, permits, and workplace documentation are verified for the actual project—not assumed from a logo.
  • Subcontracted preparation, testing, repairs, electrical work, or waste handling is disclosed.
  • The owner and contractor roles for clearing, utilities, HVAC, security, shutdowns, and emergency access are explicit.
  • Change authorization requires a written scope, price or method, and schedule effect.

For commercial projects, consult the official Alberta OHS Act, Regulation, and Code and assign project responsibilities with competent advice (Alberta OHS legislation). Do not treat this website checklist as a compliance review.

Assessment and preparation scope

  • Concrete condition is assessed across representative areas, including edges and beneath movable items.
  • Existing coatings, adhesives, sealers, curing compounds, and contamination are identified or listed as unknowns.
  • Moisture method, locations, timing, results, and product acceptance limits are stated.
  • Crack, spall, weak-concrete, joint, and repair treatment is itemized.
  • The mechanical preparation method and target surface profile are named.
  • Edges, drains, stairs, columns, coves, thresholds, and inaccessible areas have a defined detail.
  • Dust collection, isolation, cleanup, and prepared-surface inspection are included.
  • A hold point occurs after preparation and before primer.

ICRI 310.2R explains that preparation methods have different capabilities, operating requirements, limitations, and resulting profiles (ICRI 310.2R). “Diamond grind as needed” is therefore less useful than a method, target, edge plan, and verification procedure.

Materials and system build

  • Every layer is named by manufacturer and product: repair, primer, body coat, aggregate or flake, grout coat, and topcoat.
  • Colour, sheen, broadcast density, texture, and sample or mock-up approval are documented.
  • Coverage or thickness is stated in the manufacturer’s applicable terms.
  • Product substitutions require written owner approval and renewed compatibility review.
  • Current product data sheets and Canadian SDSs are attached.
  • The contractor states which document governs moisture, temperature, humidity, dew point, mixing, pot life, recoat, and cure.
  • Treatment at intentional joints and moving cracks is explicit.
  • Chemical, UV, tyre, impact, and slip claims are tied to written product/system data and actual use.

CCOHS explains that SDSs communicate hazard identification, first aid, accidental-release measures, handling, exposure controls, properties, and other essential information (CCOHS SDS guide). An SDS addresses safety; it does not replace the product data sheet or system specification.

Site logistics and safety coordination

  • Work-zone barriers, signs, authorized access, and adjacent occupant notification are planned.
  • Dust, odour, noise, electrical loads, cords, hoses, and waste routes are addressed.
  • HVAC isolation, exhaust discharge, and replacement-air paths are agreed with the building representative.
  • Material delivery, heated or secure storage, spill response, and mixed-product disposal are assigned.
  • Other trades and live operations are coordinated.
  • Emergency exits, fire equipment, panels, shutoffs, and drains remain appropriately accessible.
  • Contingencies cover power loss, unsuitable conditions, unexpected moisture, and hidden deterioration.

The contractor’s safe-work plan should fit the actual site. Do not ask for a generic template merely to tick a box; ask who reviewed it after the site walk.

Schedule and inspection gates

  • The schedule separates clearing, preparation, repairs, layers, restricted cure, and recommissioning.
  • Product-specific minimum and maximum recoat windows are mapped to shifts.
  • Required air, slab, material, humidity, and condensation conditions are logged.
  • There are named stop/go decisions before repair concealment, primer, each layer, traffic, and reopening.
  • Traffic classes are separate: worker access, owner inspection, foot traffic, equipment, vehicles, washing, and normal service.
  • Delays caused by conditions have a written decision path.

Reject generic phrases such as “ready next day” unless the bid states ready for what, under which measured conditions, and according to which product document.

Commercial terms and exclusions

  • Tax, mobilization, equipment moves, utilities, protection, waste, and cleanup are included or clearly excluded.
  • Repair quantity and the unit rate or allowance for concealed damage are stated.
  • Payment milestones follow observable deliverables.
  • Warranty language identifies the provider, duration, covered defects, exclusions, maintenance duties, and claim process.
  • No promise depends on an unverified assumption such as a dry slab or intact vapour retarder.
  • Cancellation, delay, and owner-caused access changes are addressed.

Do not infer credentials, warranties, or performance from marketing language. Verify documents directly and keep copies with the signed agreement.

Closeout package

  • Final product names, colours, lots, and SDS/PDS versions are supplied.
  • Moisture, preparation, repair, environmental, batch, and inspection records are delivered.
  • Photographs show the prepared floor and concealed repairs.
  • Cleaning products, routine, prohibited practices, and inspection intervals are written.
  • Spare material is labelled with storage and shelf-life instructions, if supplied.
  • Punch-list items and accepted appearance variations are recorded.
  • Reopening authorization identifies permitted use and date/time.

Score each bid as clear, assumption, or missing beside every applicable item. Clarify assumptions before comparing price. The strongest proposal is not necessarily the longest; it is the one that turns important decisions into verifiable scope and leaves little room for two parties to imagine different floors.

This checklist is general procurement guidance, not legal, engineering, insurance, or occupational-health advice. Verify requirements and documents with qualified Alberta professionals.