The sequence

How a flake floor actually goes.

Six steps, in this order, for a flake floor. Installation usually runs two days, and it varies with the concrete underneath.

From this job

  1. 01

    A free estimate

    Send photos of the floor, or book a visit. Either works, and both are free. Denis wants to see the concrete, what is on it now, and any cracks you already know about.

  2. 02

    Grinding

    The slab is ground to open the surface so the coating can bond. It is loud, dusty work, and the room has to be empty before it starts. The diamond grinding guide explains the profile it leaves.

  3. 03

    Cosmetic crack filling

    Visible cracks are filled so they do not read through the finish. If something turns up that is structural rather than cosmetic, you hear about it then, not later. The cracks and spalling guide covers what gets assessed.

  4. 04

    The flake broadcast

    Flake is broadcast into the coat while it is still open. This is where the colour and the pattern of the floor are set. The featured colours are on the finishes page.

  5. 05

    The scrape

    Once it has set, the surface is scraped back. That is what turns a loose broadcast into a flat floor you can walk on and clean.

  6. 06

    The top coat

    The last coat goes over everything. Where a room needs more grip, an anti-slip top coat goes on instead, and that is a decision we make with you. The slip-resistance guide covers the trade-offs.

Two things this page will not tell you: when you can park on it, and what it costs. Both depend on your slab and the conditions that week, so they are written into your quote instead of guessed at here.